Winter-ready grounds maintenance across 70+ housing schemes

Housing associations

Winter-ready grounds maintenance across 70+ housing schemes

Client
Housing provider
Location
70+ schemes
Programme
1 month
Teams
2
Visits
2 per site

A housing provider needed more than 70 schemes brought up to standard before winter, at short notice. We put two teams on it and completed two visits to every site within a month.

The brief

With winter approaching, the client asked us to step in at short notice and take on an end-of-season visit to every one of its housing schemes. Each site needed its final grass cut, hedges and shrubs cut back, beds weeded and fallen leaves cleared, so it stayed safe and tidy for residents through the winter months.

How we did it

We put two teams on it and planned the programme so every scheme had two visits within the month. The first visit cut back and cleared each site. The second caught late leaf fall and finished the sites ready for winter. Leaves were cleared from grass, paths and parking areas as well as beds, reducing slip risks for residents.

The result

All 70+ schemes were completed on programme, with two visits each, giving the client tidy, safe sites going into winter without having to manage the work themselves.

What we did

  • Hedge cutting
  • Final grass cut of the season
  • Weed removal from beds and hard surfaces
  • Shrub shaping
  • Leaf clearance from grass, paths and parking areas
Re-grassing 100 hectares of a live RAF airfield

Airports & airfields

Re-grassing 100 hectares of a live RAF airfield

Client
Tivoli, for the RAF
Location
RAF Cranwell, Lincolnshire
Area
100 hectares
Programme
Aug–Oct 2026
Seed depth
11 mm, GPS-guided

Replacing the grass across the whole of RAF Cranwell's airfield with a new type that gives birds less cover, working around live flying.

The brief

The RAF wanted the grass across the entire airfield changed to a new type that offers birds less habitat, reducing the risk of bird strikes on aircraft. The seed had to be in the ground by October to germinate, on a very busy, live airfield. Access was tightly controlled, and each stage of the work needed the right weather.

How we did it

We cut and collected the long grass across all 100 hectares, using forage harvesters feeding tractors and trailers that took the arisings off site. The existing grass was then sprayed off, only in low wind and dry conditions. A second cut and collect took the sward down as low as possible. We then drilled all 100 hectares with the new seed at a set depth of 11 mm, in three separate directions under GPS control, so coverage is even and there are no gaps for birds to shelter in. Finally, the whole area was rolled with a Cambridge roller.

The result

The whole airfield was seeded within the window, around live operations. The new grass type gives birds less habitat, so fewer birds use the airfield and the risk of bird strikes is reduced.

What we did

  • Cut and collect of 100 hectares of long airfield grass
  • Arisings removed off site with forage harvesters and tractors with trailers
  • Spraying off the existing grass in suitable weather
  • Second cut and collect to bring the sward down to the lowest level
  • GPS-guided drilling in three directions at 11 mm depth
  • Rolling the whole area with a Cambridge roller
Repairing an annex after an escape of water

Insurers

Repairing an annex after an escape of water

Client
Novate Solutions
Location
Nottingham
Programme
2 weeks
Team
2–3 operatives, plus electricians
Customer score
5 out of 5

Insurance repairs to an annex in Nottingham after an escape of water, finished in two weeks while the homeowner carried on living there.

The brief

Novate Solutions asked us to carry out insurance repairs at a customer's annex after an escape of water. The homeowner was living there throughout, so before we started we agreed a plan showing when we would be on site and what would be done at each stage. The property is old and the electrics needed bringing up to current regulations. We had to move quickly so the customer had full use of the property again as soon as possible, without needing alternative accommodation.

How we did it

Our insurance team of two to three operatives worked on site for the full two weeks, alongside the electricians we regularly use. We laid a latex screed over the sub-floor, then fitted new underlay, laminate flooring and pine skirting boards. We supplied and fitted a new kitchen with appliances, tiled the walls and redecorated throughout. The electrics were tested and upgraded where needed.

The result

The work was finished within the two weeks agreed. In the post-work survey the customer gave us 5 out of 5 in every category, covering punctuality, communication, how friendly and tidy the team were, their competence and the overall standard of work.

What we did

  • Latex screed over the sub-floor
  • New underlay and laminate flooring
  • New pine skirting boards
  • New kitchen and appliances, supplied and fitted
  • Wall tiling
  • Full redecoration
  • Electrical testing and upgrades